Mangaung Metropolitan Municipality has taken a decision to find a sustainable water supply for Bloemfontein and the surrounding areas and has proposed a bulk water supply scheme from Gariep Dam. Phase 1 of the project includes a bankable feasibility study of the bulk water supply scheme, while phase 2 of the project will include detailed studies and designs.
Scope:
Undertake the environmental feasibility study, assess the occupational health and safety risks, and deal with the land matters
as part of the larger bankable feasibility study.