Skip to main content

Accelerated Schools Infrastructure Delivery Initiative (ASIDI)

Case Study: ,

Accelerated Schools Infrastructure Delivery Initiative (ASIDI)
  • Project Name:
    Accelerated Schools Infrastructure Delivery Initiative (ASIDI)
  • Client:
    Development Bank of Southern Africa
  • Project value:
    R198 million
  • Purpose:
    Replacing of 50 schools in the Eastern Cape constructed with inappropriate materials, (e.g. mud schools) with new schools that meet the Department of Basic Education’s specified levels of functionality. The project includes the relevant environmental aspects of the initiative.
  • Scope:
    Identification of environmental aspects and issues to be managed during the design and construction stages; drafting and implementing an environmental management programme for each site; and serving as the environmental control officer (compliance monitoring) during the construction. Occupational health and safety services entail the identification of safety hazards during the planning and design stages; risk assessments; and the development of safety specifications for the tender documentation. Safety audits and monitoring will be carried out during construction.
  • Responsible business units:
    GA Environment